Completed Projects

MAX_0162.JPEG

Data Center - Kuna, Idaho

We provided full excavation and utility installation services for this project, including sewer, water, and storm drain systems with pipe sizes ranging from 2" to 24". Our team executed precise trenching, grading, and backfilling to ensure efficient and compliant utility placement. With a focus on quality and safety, we delivered a durable infrastructure foundation for the development.

Data Center Screening - Kuna, Idaho

We screened and placed high-quality topsoil for the stormwater retention basins and landscape windows, ensuring proper drainage and soil stability. Our work helped optimize water management and support long-term vegetation growth, enhancing both functionality and aesthetics of the site.

MAX_0153.JPEG
IMG_2835.JPEG

Peterson BMW - Boise, Idaho

For Peterson BMW, we demolished the existing infrastructure and completed a full site redevelopment. Our team installed utilities and seepage beds, excavated for the new building, and prepared the building pad and parking lot. Through precise grading and site preparation, we ensured a solid foundation for the project’s successful completion.

Aviation Sub Division - Meridian, Idaho

For the Aviation Subdivision project, we began by rerouting the existing irrigation canal and installing 48" RCP to support proper water flow. Once completed, we installed utilities and prepared the site infrastructure for concrete and pavement, ensuring a stable and well-graded foundation for the development.